Certification Path

The Google Professional Data Engineer Certification is one of the highest level of certification mainly focussing to the professional Data Engineering.

There is no prerequisite for this exam but still it would be best to follow some sequence in order to prove immense knowledge as a Google professional Data Engineer.

You can complete Google Associate Certifications then approach for the professional certification. For more information related to Google cloud certification track Google-certification-path

NEW QUESTION 70
An organization maintains a Google BigQuery dataset that contains tables with user-level data. They want to expose aggregates of this data to other Google Cloud projects, while still controlling access to the user-level data. Additionally, they need to minimize their overall storage cost and ensure the analysis cost for other projects is assigned to those projects. What should they do?

  • A. Create dataViewer Identity and Access Management (IAM) roles on the dataset to enable sharing.
  • B. Create and share a new dataset and table that contains the aggregate results.
  • C. Create and share a new dataset and view that provides the aggregate results.
  • D. Create and share an authorized view that provides the aggregate results.

Answer: A

Explanation:
Explanation/Reference: https://cloud.google.com/bigquery/docs/access-control

 

NEW QUESTION 71
You have a job that you want to cancel. It is a streaming pipeline, and you want to ensure that any data that is in-flight is processed and written to the output. Which of the following commands can you use on the Dataflow monitoring console to stop the pipeline job?

  • A. Drain
  • B. Cancel
  • C. Stop
  • D. Finish

Answer: A

Explanation:
Explanation
Using the Drain option to stop your job tells the Dataflow service to finish your job in its current state. Your job will immediately stop ingesting new data from input sources, but the Dataflow service will preserve any existing resources (such as worker instances) to finish processing and writing any buffered data in your pipeline.
Reference: https://cloud.google.com/dataflow/pipelines/stopping-a-pipeline

 

NEW QUESTION 72
Your neural network model is taking days to train. You want to increase the training speed. What can you do?

  • A. Increase the number of input features to your model.
  • B. Subsample your test dataset.
  • C. Subsample your training dataset.
  • D. Increase the number of layers in your neural network.

Answer: D

 

NEW QUESTION 73
You are selecting services to write and transform JSON messages from Cloud Pub/Sub to BigQuery for a
data pipeline on Google Cloud. You want to minimize service costs. You also want to monitor and
accommodate input data volume that will vary in size with minimal manual intervention. What should you
do?

  • A. Use Cloud Dataflow to run your transformations. Monitor the total execution time for a sampling of jobs.
    Configure the job to use non-default Compute Engine machine types when needed.
  • B. Use Cloud Dataproc to run your transformations. Monitor CPU utilization for the cluster. Resize the
    number of worker nodes in your cluster via the command line.
  • C. Use Cloud Dataflow to run your transformations. Monitor the job system lag with Stackdriver. Use the
    default autoscaling setting for worker instances.
  • D. Use Cloud Dataproc to run your transformations. Use the diagnosecommand to generate an
    operational output archive. Locate the bottleneck and adjust cluster resources.

Answer: D

 

NEW QUESTION 74
You are operating a streaming Cloud Dataflow pipeline. Your engineers have a new version of the pipeline with a different windowing algorithm and triggering strategy. You want to update the running pipeline with the new version. You want to ensure that no data is lost during the update. What should you do?

  • A. Stop the Cloud Dataflow pipeline with the Drain option. Create a new Cloud Dataflow job with the updated code
  • B. Update the Cloud Dataflow pipeline inflight by passing the --update option with the --jobName set to the existing job name
  • C. Update the Cloud Dataflow pipeline inflight by passing the --update option with the --jobName set to a new unique job name
  • D. Stop the Cloud Dataflow pipeline with the Cancel option. Create a new Cloud Dataflow job with the updated code

Answer: B

 

NEW QUESTION 75
Which Java SDK class can you use to run your Dataflow programs locally?

  • A. MachineRunner
  • B. LocalPipelineRunner
  • C. LocalRunner
  • D. DirectPipelineRunner

Answer: D

Explanation:
DirectPipelineRunner allows you to execute operations in the pipeline directly, without any optimization.
Useful for small local execution and tests
Reference: https://cloud.google.com/dataflow/java-
sdk/JavaDoc/com/google/cloud/dataflow/sdk/runners/DirectPipelineRunner

 

NEW QUESTION 76
Your company is performing data preprocessing for a learning algorithm in Google Cloud Dataflow.
Numerous data logs are being are being generated during this step, and the team wants to analyze them. Due to the dynamic nature of the campaign, the data is growing exponentially every hour.
The data scientists have written the following code to read the data for a new key features in the logs.
BigQueryIO.Read
.named("ReadLogData")
.from("clouddataflow-readonly:samples.log_data")
You want to improve the performance of this data read. What should you do?

  • A. Call a transform that returns TableRow objects, where each element in the PCollexction represents a single row in the table.
  • B. Specify the TableReference object in the code.
  • C. Use .fromQuery operation to read specific fields from the table.
  • D. Use of both the Google BigQuery TableSchema and TableFieldSchema classes.

Answer: A

 

NEW QUESTION 77
MJTelco Case Study
Company Overview
MJTelco is a startup that plans to build networks in rapidly growing, underserved markets around the world. The company has patents for innovative optical communications hardware. Based on these patents, they can create many reliable, high-speed backbone links with inexpensive hardware.
Company Background
Founded by experienced telecom executives, MJTelco uses technologies originally developed to overcome communications challenges in space. Fundamental to their operation, they need to create a distributed data infrastructure that drives real-time analysis and incorporates machine learning to continuously optimize their topologies. Because their hardware is inexpensive, they plan to overdeploy the network allowing them to account for the impact of dynamic regional politics on location availability and cost.
Their management and operations teams are situated all around the globe creating many-to-many relationship between data consumers and provides in their system. After careful consideration, they decided public cloud is the perfect environment to support their needs.
Solution Concept
MJTelco is running a successful proof-of-concept (PoC) project in its labs. They have two primary needs:
Scale and harden their PoC to support significantly more data flows generated when they ramp to more

than 50,000 installations.
Refine their machine-learning cycles to verify and improve the dynamic models they use to control

topology definition.
MJTelco will also use three separate operating environments - development/test, staging, and production
- to meet the needs of running experiments, deploying new features, and serving production customers.
Business Requirements
Scale up their production environment with minimal cost, instantiating resources when and where

needed in an unpredictable, distributed telecom user community.
Ensure security of their proprietary data to protect their leading-edge machine learning and analysis.

Provide reliable and timely access to data for analysis from distributed research workers

Maintain isolated environments that support rapid iteration of their machine-learning models without

affecting their customers.
Technical Requirements
Ensure secure and efficient transport and storage of telemetry data

Rapidly scale instances to support between 10,000 and 100,000 data providers with multiple flows

each.
Allow analysis and presentation against data tables tracking up to 2 years of data storing approximately

100m records/day
Support rapid iteration of monitoring infrastructure focused on awareness of data pipeline problems

both in telemetry flows and in production learning cycles.
CEO Statement
Our business model relies on our patents, analytics and dynamic machine learning. Our inexpensive hardware is organized to be highly reliable, which gives us cost advantages. We need to quickly stabilize our large distributed data pipelines to meet our reliability and capacity commitments.
CTO Statement
Our public cloud services must operate as advertised. We need resources that scale and keep our data secure. We also need environments in which our data scientists can carefully study and quickly adapt our models. Because we rely on automation to process our data, we also need our development and test environments to work as we iterate.
CFO Statement
The project is too large for us to maintain the hardware and software required for the data and analysis.
Also, we cannot afford to staff an operations team to monitor so many data feeds, so we will rely on automation and infrastructure. Google Cloud's machine learning will allow our quantitative researchers to work on our high-value problems instead of problems with our data pipelines.
MJTelco needs you to create a schema in Google Bigtable that will allow for the historical analysis of the last 2 years of records. Each record that comes in is sent every 15 minutes, and contains a unique identifier of the device and a data record. The most common query is for all the data for a given device for a given day. Which schema should you use?

  • A. Rowkey: date#device_id
    Column data: data_point
  • B. Rowkey: date
    Column data: device_id,data_point
  • C. Rowkey: device_id
    Column data: date, data_point
  • D. Rowkey: data_point
    Column data: device_id,date
  • E. Rowkey: date#data_point
    Column data: device_id

Answer: D

 

NEW QUESTION 78
Your company is performing data preprocessing for a learning algorithm in Google Cloud Dataflow.
Numerous data logs are being are being generated during this step, and the team wants to analyze them.
Due to the dynamic nature of the campaign, the data is growing exponentially every hour.
The data scientists have written the following code to read the data for a new key features in the logs.
BigQueryIO.Read
.named("ReadLogData")
.from("clouddataflow-readonly:samples.log_data")
You want to improve the performance of this data read. What should you do?

  • A. Call a transform that returns TableRowobjects, where each element in the PCollectionrepresents
    a single row in the table.
  • B. Use of both the Google BigQuery TableSchemaand TableFieldSchemaclasses.
  • C. Use .fromQueryoperation to read specific fields from the table.
  • D. Specify the TableReferenceobject in the code.

Answer: A

 

NEW QUESTION 79
MJTelco Case Study
Company Overview
MJTelco is a startup that plans to build networks in rapidly growing, underserved markets around the world.
The company has patents for innovative optical communications hardware. Based on these patents, they can create many reliable, high-speed backbone links with inexpensive hardware.
Company Background
Founded by experienced telecom executives, MJTelco uses technologies originally developed to overcome communications challenges in space. Fundamental to their operation, they need to create a distributed data infrastructure that drives real-time analysis and incorporates machine learning to continuously optimize their topologies. Because their hardware is inexpensive, they plan to overdeploy the network allowing them to account for the impact of dynamic regional politics on location availability and cost.
Their management and operations teams are situated all around the globe creating many-to-many relationship between data consumers and provides in their system. After careful consideration, they decided public cloud is the perfect environment to support their needs.
Solution Concept
MJTelco is running a successful proof-of-concept (PoC) project in its labs. They have two primary needs:
* Scale and harden their PoC to support significantly more data flows generated when they ramp to more than 50,000 installations.
* Refine their machine-learning cycles to verify and improve the dynamic models they use to control topology definition.
MJTelco will also use three separate operating environments - development/test, staging, and production - to meet the needs of running experiments, deploying new features, and serving production customers.
Business Requirements
* Scale up their production environment with minimal cost, instantiating resources when and where needed in an unpredictable, distributed telecom user community.
* Ensure security of their proprietary data to protect their leading-edge machine learning and analysis.
* Provide reliable and timely access to data for analysis from distributed research workers
* Maintain isolated environments that support rapid iteration of their machine-learning models without affecting their customers.
Technical Requirements
Ensure secure and efficient transport and storage of telemetry data
Rapidly scale instances to support between 10,000 and 100,000 data providers with multiple flows each.
Allow analysis and presentation against data tables tracking up to 2 years of data storing approximately 100m records/day Support rapid iteration of monitoring infrastructure focused on awareness of data pipeline problems both in telemetry flows and in production learning cycles.
CEO Statement
Our business model relies on our patents, analytics and dynamic machine learning. Our inexpensive hardware is organized to be highly reliable, which gives us cost advantages. We need to quickly stabilize our large distributed data pipelines to meet our reliability and capacity commitments.
CTO Statement
Our public cloud services must operate as advertised. We need resources that scale and keep our data secure.
We also need environments in which our data scientists can carefully study and quickly adapt our models.
Because we rely on automation to process our data, we also need our development and test environments to work as we iterate.
CFO Statement
The project is too large for us to maintain the hardware and software required for the data and analysis. Also, we cannot afford to staff an operations team to monitor so many data feeds, so we will rely on automation and infrastructure. Google Cloud's machine learning will allow our quantitative researchers to work on our high-value problems instead of problems with our data pipelines.
MJTelco needs you to create a schema in Google Bigtable that will allow for the historical analysis of the last
2 years of records. Each record that comes in is sent every 15 minutes, and contains a unique identifier of the device and a data record. The most common query is for all the data for a given device for a given day. Which schema should you use?

  • A. Rowkey: data_point
    Column data: device_id, date
  • B. Rowkey: date#device_id
    Column data: data_point
  • C. Rowkey: device_id
    Column data: date, data_point
  • D. Rowkey: date
    Column data: device_id, data_point
  • E. Rowkey: date#data_point
    Column data: device_id

Answer: A

 

NEW QUESTION 80
Which row keys are likely to cause a disproportionate number of reads and/or writes on a particular node in a Bigtable cluster (select 2 answers)?

  • A. A stock symbol followed by a timestamp
  • B. A non-sequential numeric ID
  • C. A timestamp followed by a stock symbol
  • D. A sequential numeric ID

Answer: C,D

Explanation:
Explanation
using a timestamp as the first element of a row key can cause a variety of problems.
In brief, when a row key for a time series includes a timestamp, all of your writes will target a single node; fill that node; and then move onto the next node in the cluster, resulting in hotspotting.
Suppose your system assigns a numeric ID to each of your application's users. You might be tempted to use the user's numeric ID as the row key for your table. However, since new users are more likely to be active users, this approach is likely to push most of your traffic to a small number of nodes.
[https://cloud.google.com/bigtable/docs/schema-design]
Reference:
https://cloud.google.com/bigtable/docs/schema-design-time-series#ensure_that_your_row_key_avoids_hotspotti

 

NEW QUESTION 81
MJTelco Case Study
Company Overview
MJTelco is a startup that plans to build networks in rapidly growing, underserved markets around the world.
The company has patents for innovative optical communications hardware. Based on these patents, they can create many reliable, high-speed backbone links with inexpensive hardware.
Company Background
Founded by experienced telecom executives, MJTelco uses technologies originally developed to overcome communications challenges in space. Fundamental to their operation, they need to create a distributed data infrastructure that drives real-time analysis and incorporates machine learning to continuously optimize their topologies. Because their hardware is inexpensive, they plan to overdeploy the network allowing them to account for the impact of dynamic regional politics on location availability and cost.
Their management and operations teams are situated all around the globe creating many-to-many relationship between data consumers and provides in their system. After careful consideration, they decided public cloud is the perfect environment to support their needs.
Solution Concept
MJTelco is running a successful proof-of-concept (PoC) project in its labs. They have two primary needs:
* Scale and harden their PoC to support significantly more data flows generated when they ramp to more than 50,000 installations.
* Refine their machine-learning cycles to verify and improve the dynamic models they use to control topology definition.
MJTelco will also use three separate operating environments - development/test, staging, and production - to meet the needs of running experiments, deploying new features, and serving production customers.
Business Requirements
* Scale up their production environment with minimal cost, instantiating resources when and where needed in an unpredictable, distributed telecom user community.
* Ensure security of their proprietary data to protect their leading-edge machine learning and analysis.
* Provide reliable and timely access to data for analysis from distributed research workers
* Maintain isolated environments that support rapid iteration of their machine-learning models without affecting their customers.
Technical Requirements
Ensure secure and efficient transport and storage of telemetry data
Rapidly scale instances to support between 10,000 and 100,000 data providers with multiple flows each.
Allow analysis and presentation against data tables tracking up to 2 years of data storing approximately 100m records/day Support rapid iteration of monitoring infrastructure focused on awareness of data pipeline problems both in telemetry flows and in production learning cycles.
CEO Statement
Our business model relies on our patents, analytics and dynamic machine learning. Our inexpensive hardware is organized to be highly reliable, which gives us cost advantages. We need to quickly stabilize our large distributed data pipelines to meet our reliability and capacity commitments.
CTO Statement
Our public cloud services must operate as advertised. We need resources that scale and keep our data secure.
We also need environments in which our data scientists can carefully study and quickly adapt our models.
Because we rely on automation to process our data, we also need our development and test environments to work as we iterate.
CFO Statement
The project is too large for us to maintain the hardware and software required for the data and analysis. Also, we cannot afford to staff an operations team to monitor so many data feeds, so we will rely on automation and infrastructure. Google Cloud's machine learning will allow our quantitative researchers to work on our high-value problems instead of problems with our data pipelines.
Given the record streams MJTelco is interested in ingesting per day, they are concerned about the cost of Google BigQuery increasing. MJTelco asks you to provide a design solution. They require a single large data table called tracking_table. Additionally, they want to minimize the cost of daily queries while performing fine-grained analysis of each day's events. They also want to use streaming ingestion. What should you do?

  • A. Create sharded tables for each day following the pattern tracking_table_YYYYMMDD.
  • B. Create a table called tracking_table with a TIMESTAMP column to represent the day.
  • C. Create a partitioned table called tracking_table and include a TIMESTAMP column.
  • D. Create a table called tracking_table and include a DATE column.

Answer: C

 

NEW QUESTION 82
Case Study 2 - MJTelco
Company Overview
MJTelco is a startup that plans to build networks in rapidly growing, underserved markets around the world.
The company has patents for innovative optical communications hardware. Based on these patents, they can create many reliable, high-speed backbone links with inexpensive hardware.
Company Background
Founded by experienced telecom executives, MJTelco uses technologies originally developed to overcome communications challenges in space. Fundamental to their operation, they need to create a distributed data infrastructure that drives real-time analysis and incorporates machine learning to continuously optimize their topologies. Because their hardware is inexpensive, they plan to overdeploy the network allowing them to account for the impact of dynamic regional politics on location availability and cost.
Their management and operations teams are situated all around the globe creating many-to-many relationship between data consumers and provides in their system. After careful consideration, they decided public cloud is the perfect environment to support their needs.
Solution Concept
MJTelco is running a successful proof-of-concept (PoC) project in its labs. They have two primary needs:
* Scale and harden their PoC to support significantly more data flows generated when they ramp to more than 50,000 installations.
* Refine their machine-learning cycles to verify and improve the dynamic models they use to control topology definition.
MJTelco will also use three separate operating environments - development/test, staging, and production - to meet the needs of running experiments, deploying new features, and serving production customers.
Business Requirements
* Scale up their production environment with minimal cost, instantiating resources when and where needed in an unpredictable, distributed telecom user community.
* Ensure security of their proprietary data to protect their leading-edge machine learning and analysis.
* Provide reliable and timely access to data for analysis from distributed research workers
* Maintain isolated environments that support rapid iteration of their machine-learning models without affecting their customers.
Technical Requirements
* Ensure secure and efficient transport and storage of telemetry data
* Rapidly scale instances to support between 10,000 and 100,000 data providers with multiple flows each.
* Allow analysis and presentation against data tables tracking up to 2 years of data storing approximately
100m records/day
* Support rapid iteration of monitoring infrastructure focused on awareness of data pipeline problems both in telemetry flows and in production learning cycles.
CEO Statement
Our business model relies on our patents, analytics and dynamic machine learning. Our inexpensive hardware is organized to be highly reliable, which gives us cost advantages. We need to quickly stabilize our large distributed data pipelines to meet our reliability and capacity commitments.
CTO Statement
Our public cloud services must operate as advertised. We need resources that scale and keep our data secure. We also need environments in which our data scientists can carefully study and quickly adapt our models. Because we rely on automation to process our data, we also need our development and test environments to work as we iterate.
CFO Statement
The project is too large for us to maintain the hardware and software required for the data and analysis.
Also, we cannot afford to staff an operations team to monitor so many data feeds, so we will rely on automation and infrastructure. Google Cloud's machine learning will allow our quantitative researchers to work on our high-value problems instead of problems with our data pipelines.
You need to compose visualization for operations teams with the following requirements:
* Telemetry must include data from all 50,000 installations for the most recent 6 weeks (sampling once every minute)
* The report must not be more than 3 hours delayed from live data.
* The actionable report should only show suboptimal links.
* Most suboptimal links should be sorted to the top.
* Suboptimal links can be grouped and filtered by regional geography.
* User response time to load the report must be <5 seconds.
You create a data source to store the last 6 weeks of data, and create visualizations that allow viewers to see multiple date ranges, distinct geographic regions, and unique installation types. You always show the latest data without any changes to your visualizations. You want to avoid creating and updating new visualizations each month. What should you do?

  • A. Look through the current data and compose a small set of generalized charts and tables bound to criteria filters that allow value selection.
  • B. Look through the current data and compose a series of charts and tables, one for each possible combination of criteria.
  • C. Load the data into relational database tables, write a Google App Engine application that queries all rows, summarizes the data across each criteria, and then renders results using the Google Charts and visualization API.
  • D. Export the data to a spreadsheet, compose a series of charts and tables, one for each possible combination of criteria, and spread them across multiple tabs.

Answer: A

 

NEW QUESTION 83
The _________ for Cloud Bigtable makes it possible to use Cloud Bigtable in a Cloud Dataflow pipeline.

  • A. DataFlow SDK
  • B. Cloud Dataflow connector
  • C. BigQuery Data Transfer Service
  • D. BiqQuery API

Answer: B

Explanation:
Explanation
The Cloud Dataflow connector for Cloud Bigtable makes it possible to use Cloud Bigtable in a Cloud Dataflow pipeline. You can use the connector for both batch and streaming operations.
Reference: https://cloud.google.com/bigtable/docs/dataflow-hbase

 

NEW QUESTION 84
You are building a data pipeline on Google Cloud. You need to prepare data using a casual method for a machine-learning process. You want to support a logistic regression model. You also need to monitor and adjust for null values, which must remain real-valued and cannot be removed. What should you do?

  • A. Use Cloud Dataprep to find null values in sample source data. Convert all nulls to 'none' using a Cloud Dataproc job.
  • B. Use Cloud Dataflow to find null values in sample source data. Convert all nulls to using a custom script.
  • C. Use Cloud Dataflow to find null values in sample source data. Convert all nulls to 'none' using a Cloud Dataprep job.
  • D. Use Cloud Dataprep to find null values in sample source data. Convert all nulls to 0 using a Cloud Dataprep job.

Answer: C

 

NEW QUESTION 85
What are two methods that can be used to denormalize tables in BigQuery?

  • A. 1) Use a partitioned table; 2) Join tables into one table
  • B. 1) Split table into multiple tables; 2) Use a partitioned table
  • C. 1) Join tables into one table; 2) Use nested repeated fields
  • D. 1) Use nested repeated fields; 2) Use a partitioned table

Answer: C

Explanation:
The conventional method of denormalizing data involves simply writing a fact, along with all its dimensions, into a flat table structure. For example, if you are dealing with sales transactions, you would write each individual fact to a record, along with the accompanying dimensions such as order and customer information.
The other method for denormalizing data takes advantage of BigQuery's native support for nested and repeated structures in JSON or Avro input data. Expressing records using nested and repeated structures can provide a more natural representation of the underlying data. In the case of the sales order, the outer part of a JSON structure would contain the order and customer information, and the inner part of the structure would contain the individual line items of the order, which would be represented as nested, repeated elements.
Reference: https://cloud.google.com/solutions/bigquery-data-
warehouse#denormalizing_data

 

NEW QUESTION 86
MJTelco Case Study
Company Overview
MJTelco is a startup that plans to build networks in rapidly growing, underserved markets around the
world. The company has patents for innovative optical communications hardware. Based on these patents,
they can create many reliable, high-speed backbone links with inexpensive hardware.
Company Background
Founded by experienced telecom executives, MJTelco uses technologies originally developed to
overcome communications challenges in space. Fundamental to their operation, they need to create a
distributed data infrastructure that drives real-time analysis and incorporates machine learning to
continuously optimize their topologies. Because their hardware is inexpensive, they plan to overdeploy the
network allowing them to account for the impact of dynamic regional politics on location availability and
cost.
Their management and operations teams are situated all around the globe creating many-to-many
relationship between data consumers and provides in their system. After careful consideration, they
decided public cloud is the perfect environment to support their needs.
Solution Concept
MJTelco is running a successful proof-of-concept (PoC) project in its labs. They have two primary needs:
Scale and harden their PoC to support significantly more data flows generated when they ramp to more

than 50,000 installations.
Refine their machine-learning cycles to verify and improve the dynamic models they use to control

topology definition.
MJTelco will also use three separate operating environments - development/test, staging, and production
- to meet the needs of running experiments, deploying new features, and serving production customers.
Business Requirements
Scale up their production environment with minimal cost, instantiating resources when and where

needed in an unpredictable, distributed telecom user community.
Ensure security of their proprietary data to protect their leading-edge machine learning and analysis.

Provide reliable and timely access to data for analysis from distributed research workers

Maintain isolated environments that support rapid iteration of their machine-learning models without

affecting their customers.
Technical Requirements
Ensure secure and efficient transport and storage of telemetry data

Rapidly scale instances to support between 10,000 and 100,000 data providers with multiple flows

each.
Allow analysis and presentation against data tables tracking up to 2 years of data storing approximately

100m records/day
Support rapid iteration of monitoring infrastructure focused on awareness of data pipeline problems

both in telemetry flows and in production learning cycles.
CEO Statement
Our business model relies on our patents, analytics and dynamic machine learning. Our inexpensive
hardware is organized to be highly reliable, which gives us cost advantages. We need to quickly stabilize
our large distributed data pipelines to meet our reliability and capacity commitments.
CTO Statement
Our public cloud services must operate as advertised. We need resources that scale and keep our data
secure. We also need environments in which our data scientists can carefully study and quickly adapt our
models. Because we rely on automation to process our data, we also need our development and test
environments to work as we iterate.
CFO Statement
The project is too large for us to maintain the hardware and software required for the data and analysis.
Also, we cannot afford to staff an operations team to monitor so many data feeds, so we will rely on
automation and infrastructure. Google Cloud's machine learning will allow our quantitative researchers to
work on our high-value problems instead of problems with our data pipelines.
You need to compose visualizations for operations teams with the following requirements:
The report must include telemetry data from all 50,000 installations for the most resent 6 weeks

(sampling once every minute).
The report must not be more than 3 hours delayed from live data.

The actionable report should only show suboptimal links.

Most suboptimal links should be sorted to the top.

Suboptimal links can be grouped and filtered by regional geography.

User response time to load the report must be <5 seconds.

Which approach meets the requirements?

  • A. Load the data into Google Sheets, use formulas to calculate a metric, and use filters/sorting to show
    only suboptimal links in a table.
  • B. Load the data into Google BigQuery tables, write a Google Data Studio 360 report that connects to
    your data, calculates a metric, and then uses a filter expression to show only suboptimal rows in a
    table.
  • C. Load the data into Google BigQuery tables, write Google Apps Script that queries the data, calculates
    the metric, and shows only suboptimal rows in a table in Google Sheets.
  • D. Load the data into Google Cloud Datastore tables, write a Google App Engine Application that queries
    all rows, applies a function to derive the metric, and then renders results in a table using the Google
    charts and visualization API.

Answer: D

 

NEW QUESTION 87
......


Who should take the Google Professional Data Engineer exam

Individuals should pursue the exam if they want to demonstrate their expertise and ability to design and develop Data Engineering. Following professional get benefited from Google Professional Data Engineer Certification

  • Data engineers
  • Data scientists
  • Data analysts
  • Data architects
  • Developers responsible for managing big data transformation initiatives
  • Business analysts

Latest Professional-Data-Engineer Exam Dumps Google Exam from Training: https://www.passleader.top/Google/Professional-Data-Engineer-exam-braindumps.html