The NACE-CIP1-001 PDF Dumps Greatest for the NACE Exam Study Guide!
Read Online NACE-CIP1-001 Test Practice Test Questions Exam Dumps
The Coating Inspector Level 1 Certification Exam is conducted by the National Association of Corrosion Engineers (NACE) International, a professional organization that provides education and training for the corrosion control and prevention industry. Coating Inspector Level 1 certification program is recognized globally, and it is highly respected by employers in the coating inspection industry. Candidates who pass NACE-CIP1-001 exam are certified to work as coating inspectors and can demonstrate their proficiency to potential employers.
NACE-CIP1-001 (Coating Inspector Level 1) Exam is a certification program offered by NACE International. NACE-CIP1-001 exam is designed to evaluate the knowledge and skills of individuals who work in the field of coatings inspection. Coating Inspector Level 1 certification program is intended to provide a standardized assessment of the competencies required to perform coating inspections at the entry-level. Coating Inspector Level 1 is the starting point for individuals who are looking to establish a career in the coatings industry.
NEW QUESTION # 39
Corrosion generally occurs at which of the following sites:
- A. Anode
- B. Metallic pathway
- C. Electrolyte
- D. Cathode
Answer: A
NEW QUESTION # 40
The most important factor resulting in improved job site safety is:
- A. Situational Awareness
- B. Engineering Controls
- C. Personal Protective Equipment
- D. Safety Enforcement
Answer: A
NEW QUESTION # 41
Stripe coats are best applied by:
- A. High volume low pressure spray
- B. Brush
- C. Conventional spray
- D. Airless spray
Answer: B
NEW QUESTION # 42
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT
- A. when the coating will be reapplied.
- B. what items were coated.
- C. how the item was coated.
- D. what materials were used.
Answer: C
NEW QUESTION # 43
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:
- A. Use the job specification as a guide
- B. Call the coating manufacturer for clarification
- C. Use the product data sheet as a guide
- D. Call the person who wrote the specification for clarification
Answer: A
NEW QUESTION # 44
You have just received your NACE CIP Level 1 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:
- A. Accept the assignment without hesitation
- B. Advise the prospective employer that you cannot accept the position
- C. Meet with the prospective employer to determine the scope of your role
- D. Review the NACE Attestation prior to making a decision
Answer: C
NEW QUESTION # 45
Checking is
- A. a fine crack in the surface of a coating that rarely reaches the substrate
- B. an exposed area of the substrate or previous coat material, caused by poor application technique.
- C. a very small hole in a coating caused when air or solvent is trapped in porous film and then escapes.
- D. surface breaks in the film that often result from grease or oil contamination and revel the substrate.
Answer: A
NEW QUESTION # 46
ISO SA 3 is directly equivalent to:
- A. None of the above
- B. NACE No. 3/SSPC SP 6
- C. NACE No. 1/SSPC SP 5
- D. NACE No. 2/SSPC SP 10
Answer: A
NEW QUESTION # 47
If a contractor is using a poorly maintained compressor to supply air for abrasive blast cleaning and conventional airspray, the coating inspector should perform a
- A. wet film thickness (WFT) measurement.
- B. dry film thickness (DEI) measurement.
- C. blotter test for the presence of oil and water.
- D. vial lest.
Answer: C
NEW QUESTION # 48
Check abrasive blast pressure close to the
- A. substrate
- B. compressor
- C. blast pot
- D. blast nozzle
Answer: D
NEW QUESTION # 49
SSPC SP 1 identifies the use of:
- A. Inorganic solvents
- B. A wide variety of materials
- C. Biodegradable detergents
- D. Organic solvents
Answer: B
NEW QUESTION # 50
You are the NACE Inspector on a tank lining project where a 50% solids epoxy tank lining is being applied. After application of the 19 coat you notice small blisters in some areas of the applied lining.
Your FIRST preferred course of action is to:
- A. Break the blisters to see what's inside
- B. Document the problem and advise the Contractor and Owner's representative
- C. Extract any liquid that may be inside the blister and send it to the lab for further analysis
- D. Document the problem and advise the Contractor
Answer: B
NEW QUESTION # 51
To achieve consistently accurate results with ALL alt test equipment
- A. calibrate the instrument in the field.
- B. wash your hands before sampling.
- C. wear gloves when sampling.
- D. avoid placing the sample discs on a surface.
Answer: B
NEW QUESTION # 52
NACE No. 4/SSPC-SP-7 is a joint standard for
- A. near-white metal blast cleaning.
- B. white metal blast cleaning.
- C. brush-off blast cleaning.
- D. commercial blast cleaning.
Answer: C
NEW QUESTION # 53
Inspection documentation is important because:
- A. a) only
- B. Owners use the documentation for a variety of purposes
- C. a) & b)
- D. It is the only deliverable item provided by the inspector
Answer: B
NEW QUESTION # 54
To be of value the Inspector's documentation must be:
- A. Submitted before the end of the job
- B. Timely, accurate and concise
- C. Always typewritten
- D. Always handwritten
Answer: B
NEW QUESTION # 55
Relative humidity is
- A. a measure of the amount of moisture in the air compared to saturation level.
- B. a measure of the amount of moisture in the air compared to the air temperature.
- C. the highest temperature at which moisture forms on a steel surface.
- D. the lowest temperature at which moisture forms on a steel surface.
Answer: A
NEW QUESTION # 56
You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?
- A. Abrasive blast nozzles
- B. Hand tools
- C. Power tools
- D. Airless spray equipment
Answer: C
NEW QUESTION # 57
Prior to the pre-job conference you notice that the Inspection and Test Plan does not require a hold point after surface preparation and coating application. In speaking with the owners' representative in advance of the meeting you sense he/she does not understand the importance of the hold point.
As a NACE CIP Level 1 Inspector your preferred course of action is to:
- A. Meet separately with the coating manufactures' representative and coating application company in advance of the pre-job conference
- B. Bring the matter up at the pre-job conference
- C. Default to the owner's Inspection and Test Plan
- D. Gather data and attempt to meet with the owner's representative in advance of the pre-job conference
Answer: B
NEW QUESTION # 58
What is used to determine compressed air cleanliness?
- A. Profilometer
- B. Blotter test
- C. Psychrometer
- D. Needle pressure gauge
Answer: A
NEW QUESTION # 59
The primary difference between Non-Convertible vs. Convertible coatings is:
- A. Convertible coatings do not undergo a chemical change during curing whereas Non-Convertible coatings do
- B. Non-Convertible coatings cure by co-reaction whereas Convertible coatings do not
- C. Non-convertible coatings do not undergo a chemical change during curing whereas Convertible coatings do
- D. Convertible coatings cure solely by solvent evaporation whereas Non-Convertible coatings do not
Answer: C
NEW QUESTION # 60
What is the minimum recommended distance away from an edge that an inspector should take a measurement with a dial-type magnetic pull-off Dry Film Thickness (DFT) gauge?
- A. 6.35 cm (2.5 inch)
- B. 1 cm (.39 inch)
- C. 2.5 cm (1 inch)
- D. 2.5 millimeters (.10 inch)
Answer: C
NEW QUESTION # 61
Polymerization is the process of:
- A. All organic coatings
- B. All thermoplastic coatings
- C. Monomers telegraphing
- D. Monomers joining together
Answer: D
NEW QUESTION # 62
If inspectors identify issues of non-conformance during an inspection, they should
- A. instruct the contractor's personnel in how to correct the issue so the project is not delayed
- B. perform additional tests secretly to ensure there are no other potential issues at the site
- C. inform both the Contractor and the inspector's supervisor so they can take appropriate corrective actions
- D. wait until the final report is being prepared to identify the issues in writing so they are fully documented
Answer: C
NEW QUESTION # 63
......